Floor Insuation and reworking
The floor had factory vinyl on it and so we decided to redo that area.
Original vinyl floor before I pulled it up and before the panels were removed from the walls. |
Tearing the vinyl off of the fock. This material could hold water and so we removed it. |
Installing the 1/2 foam where the flock used to be. This was a tedious job |
4" inspection port cut into the left side of the van - this will be for the electric shore power |
0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home