The big items are now getting done. We finished the upholstery on the walls that will define the sleeping space. We added 2" insulation to the inside of the panels.
|
3/8 Merante Marine Plywood over 1/2" ISO-foam insulation over 1/2" foam used for floor padding |
|
Work Horse tools next to the back floor inspection port which will allow access for electrical cords when on shore power |
|
2" 3m Thinsulite insulation installed |
|
Adding 2" of Styrofoam to the main sleeping areas. This area needed more insulation, or at least had the space for it. |
|
Nancy adding the finishing touches |
|
Walls complete |