Friday, April 21, 2017

Lots of progress since last post

The big items are now getting done. We finished the upholstery on the walls that will define the sleeping space. We added 2" insulation to the inside of the panels.

3/8 Merante Marine Plywood over 1/2" ISO-foam insulation over 1/2" foam used for floor padding

Work Horse tools next to the back floor inspection port which will allow access for electrical cords when on shore power



2" 3m Thinsulite insulation installed


Adding 2" of Styrofoam to the main sleeping areas. This area needed more insulation, or at least had the space for it.

Nancy adding the finishing touches
Walls complete


0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home